Home Remediation Case Studies
Remediation
Title Filter 
# Article Title
1 Case Study A1: Steam Enhanced DPVE (Dual Pump) at a Former Chemical Works (Manchester) - Chlorinated Solvents
2 Case Study A2: Steam Enhanced DPVE (Dual Pump) at a Former Timber Treatment Facility (Burton on Trent) - Creosote
3 Case Study A4: Steam Enhanced DPVE (Single and Dual Pump) at a Former Chemical Works (Montrose) - Chlorinated Solvents/Petroleum Hydrocarbons
4 Case Study A5: Steam Enhanced DPVE at a Former Fuel Depot (Purfleet) - Petroleum Hydrocarbons
5 Case Study A6: Steam Enhanced DPVE at a Former Chemical Works (West Drayton) - Chlorinated Solvents/Petroleum Hydrocarbons
6 Case Study B1: Chemical Oxidation at a Former Chemical Works (West London) - Chlorinated Solvents
7 Case Study B3: Chemical Oxidation at a Former Chemical Works (Thornton) Chlorinated Solvents
8 Case Study C1: Asbestos Screening at a Former MOD Site (Corsham) - Asbestos
9 Case Study C2: Asbestos Screening at a Former Chemical Works (Somerton) - Asbestos
10 Case Study C3: Asbestos - Asbestos Screening and Picking (Cambridge)
11 Case Study C3: Asbestos Screening and Picking at a Live Research Facility (Cambridge) - Asbestos
12 Case Study C4: Asbestos - Processing Asbestos Contaminated Stockpiles – A Former Packaging Factory
13 Case Study C5: Asbestos - Licenced Asbestos Contaminated Rubble at Ernesettle
14 Case Study C6: Asbestos - Asbestos Screening and Picking (Exeter)
15 Case Study D1: Windrowing on Former Industrial Land (Cardiff) - Petroleum Hydrocarbons
16 Case Study E1: Biopiling at a Former Engineering Works (Halesowen) - Petroleum Hydrocarbons
17 Case Study E2: Biopiling at a Former Dairy (Hemyock) - PCB
18 Case Study E3: Biopiling at Former Fuel Depot (Nuneaton) - Petroleum Hydrocarbons
19 Case Study E4: Biopiling - Bioremediation and Groundwater Treatment of Former Plastics Factory
20 Case Study F3: Tank Removal at a Former Petrol Filling Station (Warwick) - Petroleum Hydrocarbons
21 Case Study F4: Tank Removal at a Former Petrol Filling Station (Weybridge) - Petroleum Hydrocarbons
22 Case Study F5: Removal of UST’s, Groundwater and Soil Contamination (Exeter)
23 Case Study G1: Hydraulic Barrier Wall at a Landfill (Berkshire) - Industrial Waste
24 Case Study H1: Excavation and Disposal at a Former Chemical Works (Avonmouth) - Beryllium
25 Case Study H4: Excavation and Disposal at a Former Gas Works (Kidderminster) - Petroelum Hydrocarbons/Heavy Metals
26 Case Study H5: Excavation and Disposal at a Former Chemical Works (Temple Quay) - Petroleum Hydrocarbons
27 Case Study H7: Remediation and Enabling Works HMNB Devonport – Excavation and Disposal of Asbestos Contaminated Soils
28 Case Study I1: Soil Vapour Extraction at an Operational Paint Works (Coventry) - Petroleum Hydrocarbons
29 Case Study I2: Trial Soil Vapour Extraction at a Former Petrol Filling Station (Birmingham) - Petroleum Hydrocarbons
30 Case Study J1: Pump and Treat at a Former Petrol Filling Station (Watford) - Petroleum Hydrocarbons
31 Case Study J2: Pump and Treat at a Former Landfill (Widnes) - Heavy Metals
32 Case Study J2: Pump and Treat at a Former Landfill (Widness) - Heavy Metals
33 Case Study K2: Stabilisation at a Landfill (St Oswalds Park) - Waste
34 Case Study K2: Stabilisation at a Landfill (St Owalds Park) - Waste
35 Case Study L1: ISOC at a Former Gas Works (Croydon) - Petroleum Hydrocarbons
36 Case Study L2: ISOC at a Former Fuel Depot (South Africa) - Petroleum Hydrocarbons
37 Case Study M1: Ozone Injection at a Former Fuel Depot
38 Case Study N1: DPVE at a former Fuel Depot (Leicester) - Petroleum Hydrocarbons
39 Case Study N1: Steam Enhanced Remediation (SER) at Whittle Estates, Whetstone
40 Case Study O1: Membrane Interface Probe Investigation (Gloucester) - Chlorinated Solvents
41 Case Study P1: HRC Injection at a Former Chemical Works (Harlow) - Chlorinated Solvent
42 Case Study Q1: Part IIA Remediation of a Former Gas Works (Painswick) - Petroleum Hydrocarbons
43 Case Study R1: Churngold facilitate Planning Application for the Remediation of a 20 Hectare Brownfield Landfill Site