Client: Kier Marriott

Location: Cambridge

Remediation Value: £100,000

Project: The remediation strategy was designed to remove asbestos and produce suitable materials for reuse back on site. A clean up criteria of 0.01% asbestos fibre within treated material and open excavation was agreed. Works comprised of excavating asbestos containing materials (ACM) from the footprint of buildings, soils were then transported to a treatment area where soil screening and hand picking was undertaken to remove asbestos from the soil.