Case Study E1: Biopiling at a Former Engineering Works (Halesowen) - Petroleum Hydrocarbons

EI__pic

Client: Kendrick Homes Ltd

Location: Halesowen

Remediation Value: £350,000

Project: Bioremediation of Petroleum Hydrocarbons (up to 20,000 mg/kg) and chlorinated hydrocarbons at a former engineering works. Each hotspot was treated in individual biopiles. Soil was screened, mixed with micronutrients and covered with a compost biofilter to promote microbial activity. Air was continuously blown into the biopile by previously installed slotted pipes.