Case Study I2: Trial Soil Vapour Extraction at a Former Petrol Filling Station (Birmingham) - Petroleum Hydrocarbons |

Client: Confidential
Location: Birmingham
Remediation Value: £70,000
Project: Churngold Remediation Ltd were commissioned to undertake a pilot trial prior to the installation of a full scale remediation system comprising of Dual Phase Vacuum Extraction (via a Dual Pump System), Air Sparging and Steam Thermal Enhancement. The pilot trial was designed to provide detailed information on the performance, suitability and cost effectiveness of the proposed remediation system.