Case Study K2: Stabilisation at a Landfill (St Oswalds Park) - Waste

k2

Client: Persimmon Homes (South Midlands) Ltd

Consulting Engineers: Hydrock Consultants Ltd 

Location: Gloucester

Remediation Value: £200,000

Project: Soil stabilisation to provide a recycled product for use during leachate drain installation and for use on on-site roads

Click here to download complete case study.