B&A Wash Plant and Yard


Project Overview

Client: B&A Group

Project Name: B&A Wash Plant and Yard

Location: Avonmouth

Project Value: £850k

Engineer / Architect: Beresford Dunne Consultants Ltd

Project Period: 34 weeks

B&A Group employed Churngold as the Principal Contractor to deliver the groundworks package for the new construction of a new state-of-the-art aggregate wash plant facility.

The Scope of Works comprised a comprehensive civil engineering and infrastructure package, including: 

Site Cut and Fill operations, Installation of Piling Mats, Coordination and Attendance for Piling Operations, Pile Cropping, Construction of Reinforced Concrete (RC) Slabs and Plinths, Construction of Reinforced Concrete Retaining and Structural Walls, Installation of Concrete Drainage Pipes and Manholes, Installation of Service Ducts and associated Utility Pits, Installation of a New Water Main, Construction of Reinforced Concrete Access Roads and Hardstanding areas.

These works were undertaken to provide the necessary foundations, infrastructure, drainage, utilities and access arrangements required for the successful installation and operation of the New Aggregate Wash Plant. 

Key work carries out 

  • Reduce Level Dig

  • Installation Of Working Platform

  • Pile Attendance

  • Pile Cropping

  • Steel Reinforcement

  • Foundation Pads

  • RC Slabs

  • RC Walls

  • Drainage

  • Service Ducting

  • Installation and Electrofusion of PE Pipe

  • Attenuation Works

  • Formation of concrete Road

Next
Next

Magor Water Treatment Works