Magor Water Treatment Works


Project Overview

Client: ABinBev UK Ltd

Project Name: Magor Water Treatment Works

Location: Magor, Wales

Project Value: £800k

Engineer / Architect: Waterleau Group NV

Project Period: 30 weeks

BInBev employed Churngold to conduct the ground works package as Principal Contractor.

Works included pile mat installation piling attendance, pile cropping, foundation pads for tanks, slabs and plinths for M&E all on an active water treatment works site. Other works included the management of the tank installation. 

Following the ground works package ABInBev contracted Churngold to continue as the Principal Contractor to manage site safety for the mechanical and electrical pipes installations contracts. 

Key work carries out 

  • Reduce Level Dig

  • Installation of Working Platform

  • Pile Attendance

  • Pile Cropping

  • Steel Reinforcement

  • Foundation Pads

  • Slabs

  • Plinths