Magor Water Treatment Works
Project Overview
Client: ABinBev UK Ltd
Project Name: Magor Water Treatment Works
Location: Magor, Wales
Project Value: £800k
Engineer / Architect: Waterleau Group NV
Project Period: 30 weeks
BInBev employed Churngold to conduct the ground works package as Principal Contractor.
Works included pile mat installation piling attendance, pile cropping, foundation pads for tanks, slabs and plinths for M&E all on an active water treatment works site. Other works included the management of the tank installation.
Following the ground works package ABInBev contracted Churngold to continue as the Principal Contractor to manage site safety for the mechanical and electrical pipes installations contracts.
Key work carries out
Reduce Level Dig
Installation of Working Platform
Pile Attendance
Pile Cropping
Steel Reinforcement
Foundation Pads
Slabs
Plinths