Century Park Curo


Project Overview

Client: Curo

Project Name: Century Park Curo

Location: Lawence Weston, Bristol

Engineer: Craddy’s

Architect: GCP

Sector: Housing

Project Value: £8.5M

Project Period: 35 weeks

Churngold Construction are contracted by Curo for the ongoing delivery of a new housing development at Century Park in Lawrence Weston, Bristol.

This residential scheme encompasses 128 homes, including 30% affordable housing for social rent and Shared Ownership. Churngold served as Principal Contractor for the initial 18 weeks of enabling works before transitioning to Curo. Churngolds initiative-taking and solution-oriented approach focuses on minimizing costs and achieving project milestones, ensuring a successful and timely delivery. The construction process began with the stripping of topsoil. The Construction of adoptable roads, installation of mainline drainage systems, followed by services. Ground floors were built using traditional block and beam on precast piled foundations. By working in a collaborative manner with Curo Management, Curo Technical department, Craddy’s and GCP Architects the project has proven to be successful.

Key work carried out

Churngold used their nationally renowned experience in delivering the full range of Groundworks solutions to deliver the following works:

• Earthworks

• Importing 10,000m3 of 

stone/topsoil/clean cap

• Sub-structure Blockwork and floors

• Adoptable Storm and Foul drainage systems. Attenuation Tanks and Hydro Brake.

• Adoptable Highway works

• Paving

• Hard Landscaping

• New ducting and services

• Retaining walls

• Topsoil placement

• Services