Hilltop Park


Project Overview

Client: Bloor Homes

Project Name: Hilltop Park

Location: Chippenham

Sector: Residential

Project Value: £350k

Project Period: 5 weeks

The client had a large surplus stockpile of sub-soils onsite which needed cleared to make way for further housing plots.

Churngold deployed a technician to obtain over 30 soil samples scheduling the samples testing metals, hydrocarbons, asbestos plus a number of waste acceptance criteria testing in accordance with WM3. 

Our in-house drone survey and land survey team determined an accurate volumetric assessment. Churngold provided a fully managed service including supervision, road sweeping, banksmen, loading, hauling and disposal. A final survey of the site was then provided along with a completion report containing all the chain of custody documentation.

Key work carried out

  • Stockpile sampling & testing

  • Waste characterisation

  • Drone survey and volumetric assessment

  • Stockpile disposal

Churngold successfully managed

  • Sampling and testing

  • Topographical survey

  • All site works safely and on time and to budget during the most challenging winter months

Previous
Previous

Wenvoe Care Home

Next
Next

Century Park Curo