CHPP - Waun Gron
Project Overview
Client: Wates Construction
Project Name: Waun Gron
Location: Fairwater
Project Value: £3M
Engineer / Architect: Curtains / Powell Dobson
Project Period: 41 weeks
Following appointment by Wates, Churngold carried out the civil engineering and infrastructure works package for the construction of 44, 1-2 bedroom apartments.
The package included drainage and services installation, earthworks operations, road formation and the wider site infrastructure.
Key work carried out
Churngold Successfully managed
Installation of drainage and services.
Installation of foundations and concrete ground floor slabs.
Site access road.
278 drainage connections.
Carrying out Earthworks operations in line with Environmental constraints to ensure the safety and wellbeing of the nature and habitants within the area.
High-risk activities being delivered safely while the project remains live.
Works progressing in line with the project programme.