CHPP - Waun Gron


Project Overview

Client: Wates Construction

Project Name: Waun Gron

Location: Fairwater

Project Value: £3M

Engineer / Architect: Curtains / Powell Dobson

Project Period: 41 weeks

Following appointment by Wates, Churngold carried out the civil engineering and infrastructure works package for the construction of 44, 1-2 bedroom apartments.

The package included drainage and services installation, earthworks operations, road formation and the wider site infrastructure.

Key work carried out

Churngold Successfully managed

  • Installation of drainage and services.

  • Installation of foundations and concrete ground floor slabs.

  • Site access road.

  • 278 drainage connections.

  • Carrying out Earthworks operations in line with Environmental constraints to ensure the safety and wellbeing of the nature and habitants within the area.

  • High-risk activities being delivered safely while the project remains live.

  • Works progressing in line with the project programme.