Crick Road Care Home


Project Overview

Client: Lovell

Project Name: Crick Road Care Home

Location: Crick Road, Caldicot

Sector: Residential

Engineer: Intrado

Architect: Pentan

Project Value: £800k

Project Period: 24 weeks

Churngold Construction are contracted by Curo for the ongoing delivery of a new housing development at Century Park in Lawrence Weston, Bristol.

This residential scheme encompasses 128 homes, including 30% affordable housing for social rent and Shared Ownership. Churngold served as Principal Contractor for the initial 18 weeks of enabling works before transitioning to Curo. Churngolds initiative-taking and solution-oriented approach focuses on minimizing costs and achieving project milestones, ensuring a successful and timely delivery.

The construction process began with the stripping of topsoil. The Construction of adoptable roads, installation of mainline drainage systems, followed by services. Ground floors were built using traditional block and beam on precast piled foundations. By working in a collaborative manner with Curo Management, Curo Technical department, Craddy’s and GCP Architects the project has proven to be successful.

Key work carried out

  • Earthworks, topsoil removal, cut and fill exercise

  • Storm and Foul drainage systems. Attenuation Tanks and Hydro Brake.

  • Sub-structure.

  • Blockwork, beam & block.

  • Concrete floor slabs

  • Adoptable Highway works, car park

  • Paving

  • Hard Landscaping

  • New ducting and services

  • Topsoil placement

Churngold successfully managed

  • Existing Services

  • Environmental aspects, proximity of badger sett. 

  • Protection of existing hedge rows