Churngold Construction were approached by Sir Robert McAlpine to form the ground level compound area on Lower Castle Street in Bristol City Centre.
Large RC slabs were installed to locate a large temporary steel bridging structure to the roof level of Harvey Nichols, this then allowed the CCL team to remove the existing roof garden. This would then facilitate the full height scaffold installation and subsequent cladding replacement.
A final visit will be aligned upon the replacement of the cladding, to reinstate the roof top garden and reinstate the ground level compound.