Rotork - Bath


Project Overview

Client: Rotork Control Ltd

Project Name: Rotork

Sector: Commercial

Location: Bath

Project Value: £400k

Engineer/Architect: Mann Williams

Project Period: 16 weeks

To remove an existing cycle shelter concrete slab, construct a new concrete slab on an existing car park with associated drainage to facilitate the construction of a temporary warehouse structure.

Aganto, constructed a steel/aluminum frame structure on top of the new concrete slab. Installed cladding and a PVC inflatable roof.

Key work carried out

  • CCL was acting principal contractor for CCL works and Aganto who were contracted by Rotork to construct the temporary warehouse structure.

Churngold successfully managed

  • To manage the health and safety on site, provide and maintain the welfare facilities for all operatives involved in the project and manage Aganto during the construction of the temporary.