Rotork - Bath
Project Overview
Client: Rotork Control Ltd
Project Name: Rotork
Sector: Commercial
Location: Bath
Project Value: £400k
Engineer/Architect: Mann Williams
Project Period: 16 weeks
To remove an existing cycle shelter concrete slab, construct a new concrete slab on an existing car park with associated drainage to facilitate the construction of a temporary warehouse structure.
Aganto, constructed a steel/aluminum frame structure on top of the new concrete slab. Installed cladding and a PVC inflatable roof.
Key work carried out
CCL was acting principal contractor for CCL works and Aganto who were contracted by Rotork to construct the temporary warehouse structure.
Churngold successfully managed
To manage the health and safety on site, provide and maintain the welfare facilities for all operatives involved in the project and manage Aganto during the construction of the temporary.