Exmouth Junction
Project Overview
Client: Places for People
Project Name: Exmouth Junction - Deep foul tank
Location: Exeter
Sector: Residential
Project Value: £350K
Engineer/Architect: Hydrock/Stantec/BDC/Gould Singleton Architects
Project Period: 16 weeks
Installation of 18m long, 4m wide and 9m deep foul tank to service 104 plots plus 65 unit apartment block.
MGF Temporary works design and equipment was utilised to provide safe access and safe installation of the tank. A movax attachment was used to install the 9m long Larssen Sheet piles to great affect, making the install process quick, safe and efficient.
During the excavation Rock was encountered and high volumes of water. Breaker attachments were used to break out the rock and hydrainer pumps were used to remove the water.
Due to the depth a 35t long reach excavator was used to excavate.
Key work carried out
Foundations, Drainage & External Works
Churngold successfully managed
Site restrictions – busy major roads on two sides of the site.
Major Rail line on site boundary.
Shared main access with multiple other development sites.
Co-ordination with major sewer diversion works with easement through part of the site during the works.
Delivery of the Remediation, Phased Earthworks and groundworks phase.