Exmouth Junction


Project Overview

Client: Places for People

Project Name: Exmouth Junction - Deep foul tank

Location: Exeter

Sector: Residential

Project Value: £350K

Engineer/Architect: Hydrock/Stantec/BDC/Gould Singleton Architects

Project Period: 16 weeks

Installation of 18m long, 4m wide and 9m deep foul tank to service 104 plots plus 65 unit apartment block.

MGF Temporary works design and equipment was utilised to provide safe access and safe installation of the tank. A movax attachment was used to install the 9m long Larssen Sheet piles to great affect, making the install process quick, safe and efficient.

During the excavation Rock was encountered and high volumes of water. Breaker attachments were used to break out the rock and hydrainer pumps were used to remove the water.

Due to the depth a 35t long reach excavator was used to excavate.

Key work carried out

  • Foundations, Drainage & External Works

Churngold successfully managed

  • Site restrictions – busy major roads on two sides of the site.

  • Major Rail line on site boundary.

  • Shared main access with multiple other development sites.

  • Co-ordination with major sewer diversion works with easement through part of the site during the works.

  • Delivery of the Remediation, Phased Earthworks and groundworks phase.