Grainger


Project Overview

Client: Grainger

Project Name: Grainger

Location: Exeter

Sector: Civils

Project Value: £3.2M

Engineer/Architect: Hydrock

Project Period: 26 weeks

Construction of a new road to facilitate a new housing development of 104 houses, 65 unit apartment block and 147 until apartment block.

In addition to the new road a building platform was levelled and constructed for a future apartment block. The site was contaminated with hydrocarbons and asbestos. Our specialist remediation teams worked in conjunction with our construction team to safely carry out remediate the ground during the construction process.

Key work carried out

  • Surfacing.

Churngold successfully managed

  • Working alongside a live network rail line.

  • Carrying out remediation in line with the remediation strategy.

  • Installation of deep drainage.

  • Installation of an adopted foul pump station.

  • Directional drilling under live highway.

  • Section 104 works.

  • Installation of precast retaining wall units.

  • Connection into existing 5m deep brick culvert.

  • Installation of sheets and frames temporary works.