Silverthorne Lane
Project Overview
Client: Square Bay
Project Name: Silverthorne Lane
Location: St. Phillips, Bristol
Sector: Residential
Project Value: £1.7M
Engineer/Architect: Arup/AWP
Project Period: 47 weeks
Comprised of undertaking 278 works to Silverthorne Lane as well as the existing footpaths.
Works included widening Silverthorne Passage with associated retaining walls, installing new lighting design to suit new footpath layout. Back-to-back kerb line to create a shared cycle/walkway. Surfacing and lining the new road construction Installed new signage, uncontrolled points.
Key work carried out
Resurfacing road construction.
Kerbing and paving
Drainage and services
Retaining walls
Streetlighting
Churngold successfully managed
Working alongside National Grid ensuring CCL works kept on programme to meet NG target date on site.
Ensuring little to minimal disruption to the surrounding business’ maintaining consistent contact throughout the job.
Working alongside HG and Montel sites to maintain access for both CCL, HG & Montel and prohibit any disruption.
Working alongside the floating harbour, FRAP license provided for client as requested.
Temporary works to listed wall.
Works completed on time.