Wenvoe Care Home
Project Overview
Client: Pendragon Construction
Project Name: Wenvoe Care Home
Location: Wenvoe, Barry
Sector: Residential
Project Value: £1.2M
Project Period: 40 weeks
The new care home has provided 70 fully furnished en-suite rooms for people to live in and enjoy.
It includes an on-site gym, cinema, coffee lounge and many other facilities to provide pass times for the residents.
The balconies and terraces overlook the landscaped gardens, visiting is made easy with the on-site car park along with the adaptions to the bus stops just outside the site.
Key work carried out
Churngold used their nationally renowned experience in delivering the full range of groundworks solutions to deliver the following works:
Earthworks, topsoil removal, cut and fill, import of material to make up levels.
Storm and Foul drainage systems. Attenuation Tanks and Hydro Brake.
Sub-structure.
Blockwork, beam & block.
Concrete floor slabs
Construction of car park
Paving
New ducting and services
Hard Landscaping
Topsoil placement
Churngold successfully managed
Existing Services
Environmental aspects, protection of brook with storm water outlet. Protected trees and hedges.
Drainage connection into busy highway.