Bristol University Campus


Project Overview

Client: Sir Robert McAlpine

Project Name: TQA1 Bristol University Campus

Location: Bristol

Engineer: Buro Happold

Sector: Educational

Project Value: £21M

Project Period: 191 weeks

Following on from us carrying out the Enabling Work package directly for The University of Bristol, we won the groundworks package for the main works with Sir Robert McAlpine, off the back of a 12 month PCSA period.

The site is very complex featuring river frontage, working alongside major railway lines, excavating, stockpiling, testing and disposal of contaminated ground, and dealing with contaminated groundwater, all in line with our environmental and sustainability obligations.

During the PCSA period we attended multiple design workshops working closely with Buro Happold and Heidelberg, the specified concrete supplier.

Key work carried out

  • Pile attendance

  • Pile cropping

  • Pile caps / Cores

  • Drainage

  • Water / gas proofing

  • Ground floor slabs

  • Retaining walls

  • S278 Works

  • Services installation

  • Tarmac surfacing

Churngold successfully managed

  • Obtaining the BAPA, FRAP and MMO licenses.

  • Employing marine specialist subcontractor for limpet dam installation.

  • MMP with Buro Happold.

  • Coordination with piling contractor and RC frame contractor.

  • Meeting programme expectations meaning concrete pours 500m3 per day.