Wepa Infrastructure


Project Overview

Client: Wepa

Project Name: Wepa Infrastructure

Location: Bridgend

Project Value: £2.6M

Engineer / Architect: BHM

Project Period: 12 weeks

Following the appointment by BHM, Churngold carried out culvert diversion and creation of piling mat.

The package included the cutting and turning of the existing ground down to 3 meters, removal of any obstructions and then creating a piling mat, including a diversion of a 1350mm cuvert diversion and chemical line.

Key work carried out

Churngold Successfully managed

  • Reduce digging down to 4 meter whilst keeping existing water levels under control.

  • Removal of all concrete obstruction.

  • Diversion of both 1350mm culvert and 300mm chemical line.

  • Create piling mat that satisfies the client and design requirements. 

  • Carrying out Earthworks operations in line with Environmental constraints to ensure the safety and wellbeing of the nature and habitants within the area.

  • High-risk activities being delivered safely while the project remains live.

  • Works progressing in line with the project programme.